T-minus, NET, hold and scrub: launch countdown terms
Launch countdown terms in plain English: what T-minus, L-minus, NET, hold, scrub and max Q mean, in the order a launch day unfolds, with every source linked.
T-minus is the time on the countdown clock, and NET stands for no earlier than. A hold is a pause in the countdown. A scrub is NASA's word for the launch team standing down to try again another day. This glossary takes those four and the other launch countdown terms in roughly the order launch day throws them at you. Each section says whose definition it's using, and every page is linked under Sources at the bottom.
NET, TBD, TBC and Go: reading the schedule
NASA's science acronym list expands NET as no earlier than. A NET date gives the earliest possible launch opportunity (one NASA space station blog post used the phrase that way for a cargo flight). An archived copy of NASA's April 2011 shuttle and rocket launch schedule labels some dates No Earlier Than (Tentative).
TBD is to be determined, according to the same acronym list. The Launch Library 2 launch database goes further and spells out what each of its status words means.
| Status | What it means in Launch Library 2 |
|---|---|
| TBD (To Be Determined) | The current date is a placeholder or a rough estimation based on unreliable or interpreted sources |
| TBC (To Be Confirmed) | Official confirmation is awaited and the current date is known with some certainty |
| Go for Launch | The current T-0 (launch time) has been confirmed by official or reliable sources |
| On Hold | The countdown has been paused but the launch can still happen within the launch window |
See what is flying over you, right now
PlaneTicker Desktop is a compact LED display that shows live aircraft above your location. No subscription, no app, free flight data forever.
Wet dress rehearsal and static fire
Both come before the flight. United Launch Alliance describes a wet dress rehearsal as a full dress rehearsal for launch with the rocket fuelled, where the clocks count down to moments before the rocket would ignite on launch day. Why wet? Because the liquid propellants are loaded into the rocket during the test, says Wikipedia, which adds that in a pure wet dress rehearsal the engines aren't ignited.
A static fire is the test where the engines do light. The SpaceX CRS-5 mission press kit, hosted by NASA, describes it as a pre-flight test in which Falcon 9's nine first-stage engines are ignited for a few seconds with the vehicle held securely to the pad.
Launch window and instantaneous window
A launch window is the span of time in which a launch can take place and still satisfy the constraints set by safety and the mission's objectives (the definition in NASA's Basics of Space Flight). ESA's launchers FAQ defines it by the orbit: the launch must take place within a precise period, in hours and minutes, if the spacecraft on board is to be placed into the correct orbit. Windows usually run from one second to several hours, according to an archived copy of NASA's Launch Schedule 101 page.
At the short end, Wikipedia says, a mission with a very specific orbit (a rendezvous with the International Space Station, say) may have a window that is a single moment in time, known as an instantaneous launch window. On one Falcon 9 flight, the SpaceX CRS-5 press kit says, the window had to be hit precisely because an off-time lift-off would make Dragon use extra propellant to reach the space station, and if it was missed the mission would be attempted on another day.
T-minus and T-0
T-minus is the time on the countdown clock. The US Space Force range safety glossary defines it as the time before the scheduled launch time, not including built-in holds in the countdown (the planned pauses, covered below). So T-minus 60 minutes can mean a wait of more than an hour. NASA's 1965 Dictionary of Technical Terms for Aerospace Use says it indicates there are 60 minutes to go, except for holds and recycling (a return to an earlier point in the count, also covered below).
T-0 is launch time (T minus 0, in the Space Force glossary). It can be reset, mind. NASA reported that after the clock was recycled back to T-10 minutes during a rehearsal, a new T-0 was set.
L-minus
L-minus indicates how far away lift-off is in hours and minutes, in NASA's wording. In the Space Force glossary it's the absolute time before the scheduled launch time, which includes all scheduled countdown holds and is always equal to or greater than T-minus. During planned holds, NASA says, the countdown clock and T-minus stop while L-minus continues to advance. Countdown updates on a United Launch Alliance mission page for an Atlas V launch give both together, for example T-minus 6 hours 20 minutes alongside L-6 hours 50 minutes.
Hold and built-in hold
A hold is NASA's word for a pause in the countdown. Its 1965 dictionary defines one as stopping the count and waiting until an obstacle has been removed so the countdown can resume.
Some holds are in the plan from the start. They're built in, NASA says, so the launch team can target a precise launch window and have a cushion of time for certain tasks and procedures without affecting the overall schedule. On the space shuttle they varied in length and always occurred at the same seven times, from T-27 hours to T-9 minutes, according to an archived copy of NASA's Countdown 101 page.
Go/no-go poll and terminal count
There are polls at various times in which the launch managers report whether they are go for launch, says NASA's Basics of Space Flight. On Artemis II, NASA's launch day updates describe the go/no-go poll as the launch director polling the team on whether to proceed with the final 10 minutes of the countdown.
Those 10 minutes are what NASA calls terminal count. During it, the agency's live coverage of the Artemis II wet dress rehearsal says, automated systems take control of countdown operations, final checks occur and the rocket switches to internal power. The SpaceX CRS-5 press kit has the terminal countdown for that Falcon 9 flight beginning at T-10 minutes, at which point all systems are autonomous.
Recycle and scrub
To recycle, in NASA's 1965 dictionary, is to stop the count during a countdown and return to an earlier point in it. NASA's Artemis II countdown gives a case: if the clock stops after T-1 minute 30 seconds but before the automated launch sequencer takes over, teams can recycle back to T-10 to try again, provided enough of the launch window remains. For the SLS (Space Launch System) rocket, NASA says, the whole recycle process lasts about 60 to 90 minutes.
If there's any reason for doubt, a NASA podcast says, the launch team can stand down and try again another day. NASA calls that a scrub. Rocket Lab's June 2018 press kit says planned launches will often be postponed or scrubbed, and that a scrub may be called primarily for weather or technical issues, at any time ahead of launch and as late as 0.1 seconds before lift-off. How long the delay lasts depends on the nature of the problem, according to the archived Launch Schedule 101 page.
Lift-off, the plus count and max Q
Lift-off, in NASA's 1965 dictionary, is a rocket vehicle separating from its launch pad in a vertical ascent. After zero the count goes up: the same dictionary has a plus count, a count in seconds (plus 1, plus 2 and so on) used to check on the sequence of events after the countdown has ended.
Max Q, in NASA's description, is the moment of peak aerodynamic stress on the rocket, which happens as the vehicle is accelerating and climbing through the thick lower atmosphere. NASA Glenn explains why it's a peak: the dynamic pressure on a rocket rises with velocity to a maximum value, called the maximum dynamic pressure or max Q, then falls as the air density decreases.
Which of these words appear on a PlaneTicker
In rocket launch mode a PlaneTicker Desktop panel shows upcoming launches one at a time, and several of these words turn up on it. Once a launch time is set there's a T-minus countdown. At T-0 the clock passes zero and counts up in green, and the launch stays on the panel for up to an hour after T-0. The status words are GO, TBC (to be confirmed), TBD (to be determined), HOLD and FLIGHT. HOLD turns the status red, and FLIGHT shows once the schedule says the rocket is flying. The launch data is Launch Library 2 by The Space Devs, the database behind the status table above.
A loosely known launch time gets a looser display. Known to the minute, the panel counts down in hours, minutes and seconds; known only to the hour, it shows hours. And with no time set it shows the day, month or quarter the launch is expected in and doesn't count down at all. There's a free live launch board that runs in a browser, and a separate post on PlaneTicker's rocket launch mode.
Sources
- NASA: Artemis II launch countdown
- NASA: live Artemis II launch day updates
- NASA: live Artemis II wet dress rehearsal coverage
- NASA: Artemis II wet dress rehearsal countdown begins
- NASA: Basics of Space Flight, chapter 14
- NASA: science acronym list
- NASA: Dictionary of Technical Terms for Aerospace Use (SP-7, 1965, scanned PDF of about 129 MB)
- NASA space station blog: Dragon cargo launch no earlier than May 3
- NASA: shuttle and rocket launch schedule, April 2011 (archived)
- NASA: Launch Schedule 101 (archived)
- NASA: space shuttle Countdown 101 (archived)
- NASA: Curious Universe podcast on Artemis II
- NASA: rocket reaches max Q
- NASA Glenn: dynamic pressure
- ESA: launchers FAQ
- US Space Force: range safety glossary (SSCMAN 91-710 Volume 7)
- SpaceX: CRS-5 mission press kit (hosted by NASA)
- United Launch Alliance: the wet dress rehearsal
- United Launch Alliance: Atlas V AEHF-4 mission page
- Rocket Lab: June 2018 press kit
- The Space Devs: Launch Library 2 launch statuses
- Wikipedia: Launch vehicle system tests
- Wikipedia: Launch window
See what is flying over you, right now
PlaneTicker Desktop is a compact LED display that shows live aircraft above your location. No subscription, no app, free flight data forever.
Frequently asked questions
What does T-minus mean?+
T-minus is the time on the countdown clock. The US Space Force range safety glossary defines it as the time before the scheduled launch time, not including built-in holds (planned pauses) in the countdown. So T-minus 60 minutes can mean a wait of more than an hour. NASA's 1965 Dictionary of Technical Terms for Aerospace Use says T minus 60 minutes indicates there are 60 minutes to go, except for holds and recycling (a return to an earlier point in the count).
What is the difference between T-minus and L-minus?+
T-minus is countdown clock time and leaves out the built-in holds. L-minus is the absolute time before the scheduled launch: it includes all scheduled holds and is always equal to or greater than T-minus. Both definitions come from the US Space Force range safety glossary. NASA says that during planned holds the countdown clock and T-minus stop while L-minus continues to advance.
What does NET mean on a launch schedule?+
NET stands for no earlier than, which is how NASA's science acronym list expands it. It gives the earliest possible launch opportunity: a NASA space station blog post used the phrase that way for a cargo flight. An archived NASA launch schedule from April 2011 labels some of its dates No Earlier Than (Tentative).
What is a scrub?+
A scrub is a launch attempt called off for the day. A NASA podcast says that if there is any reason for doubt the launch team can stand down and try again another day, and that NASA calls this a scrub. Rocket Lab's June 2018 press kit says a scrub may be called primarily for weather or technical issues, as late as 0.1 seconds before lift-off.
What is the difference between a hold and a scrub?+
A hold pauses the countdown. NASA's 1965 Dictionary of Technical Terms for Aerospace Use defines it as stopping the count and waiting until an obstacle has been removed so the countdown can resume, and in the Launch Library 2 launch database On Hold means the launch can still happen within the launch window. A scrub ends the attempt: a NASA podcast uses the word for the launch team standing down to try again another day.
What do TBD and TBC mean on a launch schedule?+
In the Launch Library 2 launch database, TBD (To Be Determined) means the current date is a placeholder or a rough estimation based on unreliable or interpreted sources. TBC (To Be Confirmed) means official confirmation is awaited and the current date is known with some certainty. Go for Launch means the current T-0 (the launch time) has been confirmed by official or reliable sources.
What is max Q?+
NASA describes max Q as the moment of peak aerodynamic stress on the rocket, which happens as the vehicle is accelerating and climbing through the thick lower atmosphere. NASA Glenn explains that the dynamic pressure on a rocket rises with velocity to a maximum value, called the maximum dynamic pressure or max Q, then falls as the air density decreases.
Keep reading
PlaneTicker now counts down to rocket launches
PlaneTicker's new launch mode makes the LED panel a rocket launch countdown display: nearby pads first, worldwide otherwise. £99.99 once, with no subscription.
Read moreWhat Is ADS-B and How Does Aircraft Tracking Work?
What is ADS-B? A clear explainer on how aircraft broadcast their position, how ground receivers pick it up, and how flight trackers turn it into live maps.
Read moreHow High Do Planes Fly? Altitude & Flight Levels Explained
How high do planes fly? A clear guide to cruising altitudes, flight levels, why jets fly at 35,000 feet, and how to read altitude on a flight tracker.
Read more